Mandate

  • Development
  • Obtaining administrative authorizations
  • Site preparation
  • Bank financing
  • Business consultation
  • Coming soon: Site monitoring

Main characteristics

  • In preparation for the site
  • 13 wind turbines from 2 to 2.35 MW
  • Installed capacity: 26 to 30.55 MW
  • Height between 135 to 150 m at the end of the blade
  • Establishment in the municipalities of Tréveray and Saint-Joire (55)

Energy

wind-power
WIND POWER

Client

SPETSJ