Mandate

  • Resumption of development
  • Bank financing
  • Site preparation
  • Site monitoring
  • Monitoring of local aspects during the operational phase
  • Monitoring of environmental aspects during the operation phase

Main characteristics

  • In operation since 11/08/2017
  • 9 Enercon E70 wind turbines of 2.3 MW
  • Installed capacity: 20.7 MW
  • Height of 110 m at the end of the blade
  • Establishment in the towns of Prugnanes and Saint-Paul-de-Fenouillet (66)

Energy

wind-power
WIND POWER

Client

Avanty