Mandate

  • Finalization of studies and the environmental authorization application file

Main characteristics

  • Under investigation: application for environmental authorization filed on 10/18/2019
  • 6 wind turbines from 2.2 to 3.6 MW
  • Installed capacity: 13.2 to 21.6 MW
  • Establishment in the municipalities of Dampierre-sur-Moivre and Saint-Jean-sur-Moivre (51)

Energy

wind-power
WIND POWER

Client

Confidential