Mandate

  • Development supervision
  • Bank financing
  • Site preparation
  • Site monitoring
  • Monitoring of local aspects during the operational phase
  • Monitoring of environmental aspects during the operation phase

Main characteristics

  • In operation since 11/02/2018
  • 4 Vestas V117 3.3 MW wind turbines
  • Installed capacity: 13.2 MW
  • Height of 150 m at the end of the blade
  • Establishment in the municipalities of Bonnet and Houdelaincourt (55)

Energy

wind-power
WIND POWER

Client

Confidential

0:00 / 3:38 Inauguration du parc éolien de Bonnet et Houdelaincourt : le point de vue des élus