Mandate

  • Development supervision
  • Bank financing
  • Site preparation
  • Site monitoring
  • Monitoring of environmental aspects during the operation phase

Main characteristics

  • In service since April 16, 2019
  • 3 Enercon E82 2.3 MW wind turbines
  • Installed capacity: 6.9 MW
  • Height of 119 m at the end of the blade
  • Establishment in the municipalities of Colincamps and Sailly-au-Bois (80)

Energy

wind-power
WIND POWER

Client

PE3C